Jet Grouting Asia
Row of blue jet grouting rigs working on a site at night

Jet grouting piles, ready to mobilize

Professional high-pressure jet grouting construction for general contractors and engineering firms in Southeast Asia and the Middle East. Single, double and triple tube.

One method for each ground condition

Jet grouting cuts and mixes the soil with high-pressure grout to form a solid column in place. We choose single, double or triple tube according to the soil, the column size you need and the strength it has to reach.

Single tube

Grout alone is jetted from one rod to cut and mix the soil. A direct, economical choice for soil improvement and cut-off in soft ground.

  • Foundation strengthening
  • Water-stopping curtains

Double tube

Grout is wrapped in compressed air, which carries the jet further and builds larger columns than single tube in the same soil.

  • Excavation support and base sealing
  • Larger-diameter columns

Triple tube

Water and air cut the soil first, then grout fills the cavity. This gives the largest columns and the highest-quality body for demanding jobs.

  • Deep pits and heavy foundations
  • High-strength, large-diameter columns

Where we use it

  • Foundation strengtheningSoft clay, silt and reclaimed ground that cannot carry the load.
  • Excavation cut-offWater-stopping walls and base seals for deep pits.
  • Slope stabilityStabilizing slopes and retaining zones.
  • Soil improvementRaising strength and reducing permeability before you build.
Jet grouting rigs and generator sets on site at dusk

Equipment that keeps rigs running

We bring Chinese-built jet grouting rigs together with the full plant behind them: bulk cement silos, power and control cabinets, and generator sets. Many rigs can work side by side, which keeps programmes moving.

Advanced equipment, competitive pricing and fast mobilization: that is what we offer general contractors who need a specialist subcontractor on site quickly.

Row of bulk cement silos beside jet grouting rigs
Control cabinets in front of a line of jet grouting rigs

Built on field experience

Our CEO has more than 10 years of hands-on experience operating drilling rigs and building jet grouting piles on site, with single, double and triple tube methods.

He was invited by Sinohydro to give on-site technical guidance in the Philippines. You deal with someone who has run the rigs, not only sold the work.

Jet grouting rigs at work on a large site
Jet grouting crew and rigs on a daytime site
Rigs standing on a muddy site in front of a city skyline
Single jet grouting rig drilling on an open site

How we work with you

  1. Send your documentsDrawings, soil investigation report and the pile layout, if you have them.
  2. Method and quotationWe recommend single, double or triple tube and price the work.
  3. MobilizationRigs, plant and crew move to site on the agreed date.
  4. Construction and recordsPiling to your specification, with construction records for your engineer.

Request a quotation

Tell us about the project. No soil report yet? Send what you have and our team will help judge the right method.

Or chat on WhatsApp

Sending opens your email app with the details filled in, addressed to us. Please press send there.